This is the biggest work in progress I've had in a while. This is what is taking the majority of my free time and energy. We have made a hallway through two closets to connect the 3rd bedroom to the other two bedrooms. Mudding and taping takes a while for me. I am almost done with the taping (this weekend I hope!!!) then onto mudding round 2-3 to smooth it all out. Then Kevin will take over the paint job. Right now the room is kind of a medium brown with a green rug. I'm thinking wide cream color stripes with a lightish green in between.
The ceiling is really low so I'm trying to figure out ways to lengthen the walls visually. Once this part is done it will be a little more fun!